Falls City ISD – New K-12 School

Falls City, Texas

CLIENT

Huckabee Architects

COMPLETION

2016

PROJECT SIZE

160,000 SF

SERVICES PROVIDED

Civil Engineering

Through Falls City ISD’s bond program, they received approval to construct a new K-12 school on recently acquired property across the street from the existing school campus. The new property consists of approximately 42-acres and is the location of the new 160,000 GSF school administration and classroom building, track and field, practice field, bus barn and associated parking along with other improvements. Upon completion of the new school construction, the existing school, situated on a 18-acre tract was demolished to allow the construction of a new football stadium, baseball and softball field, and associated parking.

GarzaEMC provided site civil design services for the project. The civil engineering services included a floodplain study and modification, site layout and design, grading and drainage design including several detention ponds, water and wastewater utility design, erosion control design and SWPPP, traffic control and TxDOT permitting, and the design for the rehabilitation of an existing wastewater lift station.